Downloads
| DYWIDAG Permanent Strand Anchors for seismic upgrade of a quay wallEPC marine dock for the Q-Chem project, Mesaieed, QatarThe 900 m long quay wall built by AMCON for the Q-Quem Petrochemical Complex in Mesaieed Industrial City in Qatar was to be anchored down to withstand seismic events.
Whereas drilling was carried out from floating platforms, the anchors were installed from the quay using a crane. The project was in particular characterized by an extremely short construction period: Fabrication and installation of the anchors was completed within one month after commencement of the drilling activities in January 2002.The work were completed to the satisfaction of all participants. |

